Baxi Limit Thermostat Inc Long Lead (68201410)

Product code: 68201410

About this product

The Baxi Limit Thermostat Inc Long Lead (68201410) is a practical plumbing, heating or maintenance product for repairs, replacements and installation work where the specification matches the job. It is best suited to customers who already know the size, connection or product type they need.

Check the product name, size and fitting details carefully before ordering.

Need a hand choosing?

Our experienced team are happy to help with sizing, compatibility and alternatives.